NURYOL Çimento San. ve Tic. A.Ş., accelerated his studies recently for the new cement plant, has contracted the project with IKN GmbH represented by FTR on 15.06.2012. The most important section of the production line – Preheater Tower, Rotary Kiln and Clinker Cooler is now binded. After a long technical evaluation period by Sintek Management and Project Team, the technical solution of IKN GmbH has been selected as the most efficient and suitable one than the others. A similar Pyro Process line has been put in to operation recently in Bartın Çimento that the performance figures have appeared the lowest ones in Türkiye (heat consumption, power consumption).
The contract signature ceremony came true with the following people;
Nuryol Çimento A.Ş.
Mr. Kemal HALİL– CEO;
Sintek Ltd. Şti.
Mr. Onur ATAKAY – General Mng.,
Mr. Bülent TUNCER – Projects Coordinator;
IKN GmbH
Mr. Justus Von WEDEL – Managing Director,
Mr. Sebastian MAIBAUM – Head of Proposals;
FTR Makina Ltd. Şti.
Mr. Fatih TRABZON – General Mng.
Project will be implemented in 20 months and established in Adapazarı. We wish the success of this project for our country Türkiye.